A production status should have an observable meaning.

A production status should have an observable meaning. Labels such as in progress or almost done become unreliable when each station interprets them differently. Define the entry and exit conditions for a small set of states.

## Agree on the definitions

- Separate ready, active, blocked, awaiting inspection, and accepted completion where useful.
- Identify whether the state applies to a whole job, room, assembly, or task.
- Require a reason and owner when work becomes blocked.
- Make partial completion visible rather than forcing a misleading yes-or-no answer.

## A practical distinction

A hypothetical job has nine cabinets accepted and one awaiting rework. Marking the entire job complete would mislead dispatch. Record the accepted quantity and the outstanding cabinet so the team can plan the remaining work.

## Review consistency

Ask different roles to interpret a few real records. If their answers differ, improve the definitions or level of detail before adding more status labels.

## Related reading

- [Production Scheduling for Custom Cabinetry](https://millbase.ca/blog/production-scheduling-for-custom-cabinetry)
- [Production Lead Time vs Cycle Time in Woodworking](https://millbase.ca/blog/production-lead-time-vs-cycle-time-in-woodworking)

## Definitions and further reference

- [Lean Enterprise Institute: standardized work](https://www.lean.org/lexicon-terms/standardized-work/)

## How Millbase can help your shop

### Make production conversations specific

A woodworking schedule is easier to review when the team can see the work already recorded. [Millbase Floor Pulse](https://millbase.ca/#floor-pulse) shows active workers, projects, workstations, and elapsed time. Pair it with [project records](https://millbase.ca/#projects) to discuss a delayed cabinet order with the people and work behind it, and compare logged labour with the estimate.

Ask the [Millbase AI agent](https://millbase.ca/#how-it-works) a question grounded in your workspace records. For example: *“Who is working on this project, at which workstations, and how many hours have been recorded?”* You can select a project or worker, ask follow-up questions, and request [supported reports and CSV exports](https://millbase.ca/#insights).

Use the breakdown to prepare the next production conversation. Current activity and recorded hours are evidence for planning; they do not by themselves prove that an assembly has passed inspection or is ready to ship.

## Explore the wider topic

For the broader workflow and decisions behind this guide, read [Production Scheduling for Custom Cabinetry](https://millbase.ca/blog/production-scheduling-for-custom-cabinetry).

## Frequently asked questions

### How many statuses should a shop use?

Use the smallest set that supports decisions and handoffs. Add a state only when it changes what someone needs to do.

### Should blocked work count as active production?

Keep the distinction visible. Combining them hides waiting and can overstate the work actually progressing.