# Review materials assigned to a project

See the materials connected to a specific job in one place. The quantities and costs provide context for checking material allocation and reconciling job usage.

Ask me which project to review, then list its assigned materials, quantities, units, remaining quantities, and recorded costs.

[Try this prompt](https://app.millbase.ca/try-prompt?prompt=Ask+me+which+project+to+review%2C+then+list+its+assigned+materials%2C+quantities%2C+units%2C+remaining+quantities%2C+and+recorded+costs.)

## When to use it

Review a job's material needs or investigate a material cost difference.

## What you need

A project identifier and its assigned project material records.

## What you’ll get

- A material list with quantities, units, and available remaining quantities.

- Recorded material costs and any missing values.

## How to use it

Open the prompt in Millbase, sign up or sign in if needed, then review the editable draft before sending.

Use the project number to distinguish similarly named jobs. Assigned quantities should not be assumed to equal confirmed physical consumption.