
Closing Cabinet Jobs Without Leaving Inventory and Labor Open
Job closeout should confirm that the relevant work and records have reached a defined endpoint.
Archive ·Overhead allocation distributes shared operating costs across jobs using a defined basis.

Overhead allocation distributes shared operating costs across jobs using a defined basis. The method should be understandable and consistent enough to support decisions. It is a model of cost recovery, not a direct measurement of every resource each job consumed.
An illustrative overhead pool of $120,000 divided by 6,000 planned labor hours produces a $20-per-hour allocation rate. A job using 50 hours receives $1,000 under that model. The arithmetic is simple; the suitability of the cost pool and activity base needs business review.
Compare allocated overhead with actual shared costs over the review period. Large differences may indicate changed activity, an incomplete pool, or a basis that no longer fits the work.
Use Millbase project tracking to keep a cabinet job and its sub-projects together, then compare estimates with recorded labour and material costs. Insights and reports help the team inspect the people and workstations behind a total and export supported results for the next review.
Ask the Millbase AI agent a question grounded in your workspace records. For example: “Compare this project’s estimated and actual labour, then break the logged hours down by workstation.” You can select a project or worker, ask follow-up questions, and request supported reports and CSV exports.
Check the date range, job scope, and recorded inputs before changing a quote. Keep the accounting treatment of overhead, tax, and revenue in the appropriate financial process; a shop-floor cost breakdown is only as complete as the inputs recorded.
For the broader workflow and decisions behind this guide, read Cabinet Shop Job Costing: Separate Margin From Markup.
Not necessarily. Shared costs are distributed through a chosen model. Keep that distinction clear in decisions about pricing or capacity.
No. A machine-heavy operation may need another basis or multiple pools. Choose a method suited to the operation with qualified accounting input.
Explore how Millbase connects projects, people, inventory, and labor records.
Book a live demo