A 30-Day Inventory Cleanup Plan for a Cabinet Shop
A 30-day cleanup can establish a reliable starting point if the scope is realistic.
Archive ·Project-based manufacturing needs to know which stock is available for the next job and which stock is already promised.

Project-based manufacturing needs to know which stock is available for the next job and which stock is already promised. A shelf count answers only part of that question. Connect physical material, reservations, and expected receipts before committing a production start.
An illustrative rack holds 50 sheets, with 32 reserved and four awaiting damage review. Available usable stock is 14 sheets before incoming receipts. If a new job needs 18, the shortfall is four; a purchase order arriving after the planned start does not remove the timing issue.
Check alternatives, delivery timing, and the cost of resequencing. Record the decision so purchasing and production do not independently solve the same shortage in conflicting ways.
A project warehouse needs to know when material is required and which job has a claim on it. Ten available sheets today are different from ten sheets promised by a supplier after the cutting date. Keep physical quantity, reservations, and expected supply distinct, and attach the relevant requirement or arrival date.
When priorities change, record the reassignment instead of silently borrowing material from another project. The displaced job may have no immediate shortage on the floor but still lose its ability to start next week. A reservation change is therefore a production planning decision as well as an inventory action.
Create a short review of released jobs with shortages, uncertain arrivals, or unresolved substitutions. For each exception, identify the needed item, quantity, required date, responsible person, and next action. Grouping these issues by job helps reveal whether an order is actually ready.
Close the loop after completion. Release unused reservations, return usable stock, and identify leftovers that belong to the customer or contract. Open allocations on finished jobs can make healthy stock appear unavailable and trigger unnecessary purchasing for the next project.
When a component shortage or material change affects a job, start with the recorded stock and the work it supports. Millbase inventory keeps quantities, material costs, receipts, stock lots, and usage history together. Use project tracking to review the associated labour and material costs, then reconcile the physical material before making a new commitment.
Ask the Millbase AI agent a question grounded in your workspace records. For example: “What inventory records do we have for this material, and what usage is recorded against this project?” You can select a project or worker, ask follow-up questions, and request supported reports and CSV exports.
Use the answer to locate the relevant records and investigate the exception. A physical count, approved specification, or supplier confirmation still establishes facts that have not been recorded.
Yes. Reservation changes availability, while the physical stock remains until issued or moved. Reports should distinguish those concepts.
Only under a clear business rule. Unreviewed expiry can release stock still needed by a delayed job. Give exceptions an owner and review date.